Lifting Column Automatic Bollards Installation Instructions

Lifting Column Automatic Bollards Installation Instructions:

  • 1. When installing, first embed the pre-embedded column to the position to be installed, and pay attention to whether the ground elevation of the pre-embedded column is level (column height 840mm). It is recommended that the center distance between the column and the column should not exceed 1.5m.
  • 2. When wiring, first determine the position of the hydraulic station and the control box, and distribute each 2×2cm (oil pipe) between the embedded column and the hydraulic station; the hydraulic station and the control box have two sets of lines, one of which is 2×0.6㎡ (signal line), the second is 3×2㎡ (380V control line); the control input voltage is 380V.

Construction diagram:

  • 1. Foundation digging: Dig a square groove (length 750mm*width 750mm*depth 1000mm) at the vehicle entrance and exit designated by the user, and use it to put the column part.
  • 2. Fill the bottom of the groove with concrete with a height of 160mm, and the accuracy of the horizontal plane is required to be high (the bottom of the lifting column frame can fully contact the face of the concrete underneath, so that the entire column can bear the force), and the bottom of the groove should be filled with concrete. In the middle position, leave a small drainage ditch (width 50mm*depth 50mm) for drainage.
  • 3. Drainage method:
    A. Using manual drainage or electric pumping mode, it is necessary to dig a small pool near the column, and regularly drain manually and electrically.
    B. The natural drainage mode is adopted, which is directly connected to the sewer.

Installation and debugging:

  • 1. Install the foundation
    The column is installed at the user-specified vehicle entrance and exit. According to the actual situation on site, the hydraulic station should be installed in an appropriate position for easy operation and maintenance, as close as possible to the frame (both indoor and outdoor on duty). The control box is placed in a place where it is easy to control and operate according to customer requirements (beside the operating desk of the duty staff).
  • 2. Pipeline connection

2.1. The hydraulic station is equipped with pipelines within 5 meters from the factory, and the excess part will be charged separately. After determining the installation position of the column and the hydraulic station (you can know how long the oil pipe needs to be), when excavating the foundation, according to the installation The terrain of the place shall be considered for the layout and direction of the trenches for hydraulic pipelines and control lines, and the pipelines shall be safely buried under the condition of ensuring that the pipelines do not damage other underground facilities. And mark the appropriate position to avoid damage to the pipeline and unnecessary losses during other construction operations.
2.2. The size of the pipeline pre-embedded groove should be determined according to the specific terrain. In general, the pre-embedded depth of the hydraulic pipeline is 10-30 cm and the width is about 15 cm. The pre-embedded depth of the control line is 5-15 cm and the width is about 15 cm. about 5 cm.
2.3. When installing the hydraulic pipeline, pay attention to whether the O-ring at the joint is damaged and whether the O-ring is installed correctly.
2.4. When the control line is installed, it should be protected by a threading pipe (PVC pipe), and the oil pipe should also be protected by a threading (PVC pipe).